Multi-User Research & Development Building is constructed in Singapore's first eco-business park, CleanTech Park. The basement is of 26,000m2 excavation area with maximum depth 16m, using cut and cover & bottom-up method.
Loading color scheme
Multi-User Research & Development Building is constructed in Singapore's first eco-business park, CleanTech Park. The basement is of 26,000m2 excavation area with maximum depth 16m, using cut and cover & bottom-up method.